docs(m011): record approved MVP playtest evidence

This commit is contained in:
2026-09-08 21:15:16 +03:00
parent cf187bdd1c
commit a2a8f4a59d
3 changed files with 124 additions and 24 deletions
+11 -13
View File
@@ -22,19 +22,17 @@ tests after any parameter change.
## Results
No representative completed human matches have been recorded yet.
| Run | Date | Seed or map hash | Player experience | Result | Elapsed | Artifact / compass use | Defects or balance notes |
| --- | --- | --- | --- | --- | --- | --- | --- |
| 1 | Pending | Pending | Pending | Pending | Pending | Pending | Pending |
| 2 | Pending | Pending | Pending | Pending | Pending | Pending | Pending |
| 3 | Pending | Pending | Pending | Pending | Pending | Pending | Pending |
| 4 | Pending | Pending | Pending | Pending | Pending | Pending | Pending |
| 5 | Pending | Pending | Pending | Pending | Pending | Pending | Pending |
On 2026-09-08, the project owner confirmed that the representative physical
two-player playtests covered by this protocol worked as expected, with no
gameplay defects or balance issues observed. The owner explicitly approved a
deviation from the protocol's count and elapsed-time statistics: individual
match timing, seed or hash, and per-run fields are not required for MVP
acceptance. No hard match timer was introduced.
## Assessment
Pending the five completed matches above. This document must state the
observed range and median, whether the five-minute target was met without a
timer, and whether any tuning change or approved deviation is required before
Milestone 011 can be complete.
The project owner accepted the approximately five-minute target based on the
representative playtests above and approved the absence of a quantified timing
sample. This is an approved evidence deviation, not a claim of statistical
measurement. The locked configuration remains unchanged because no issue was
reported.