@@ -130,7 +130,7 @@ Each row is a delivery milestone, not a completion claim. Expand its record befo
|
||||
| 18 | Readable, complete in-app help for implemented workflows | 17 | accepted |
|
||||
| 19 | Refactoring contract, terminology and behavior map | 18 | accepted |
|
||||
| 20 | Explicit vocabulary and named operation contexts | 19 | accepted |
|
||||
| 21 | Domain ownership of reservations and apply knowledge | 20 | pending |
|
||||
| 21 | Domain ownership of reservations and apply knowledge | 20 | accepted |
|
||||
| 22 | Transactional draft editing and client creation vertical slice | 21 | pending |
|
||||
| 23 | Readable saved-state Commit and restore scenarios | 22 | pending |
|
||||
| 24 | Session-owned first delivery and password reissue scenarios | 23 | pending |
|
||||
@@ -3877,7 +3877,7 @@ Accepted for presentation and synthetic fixture scope after independent review,
|
||||
|
||||
## Approved domain refactoring programme — milestones 19–27
|
||||
|
||||
Status: M19–M20 accepted; M21–M27 pending. The user approved the proposed direction and requested detailed milestones on 2026-10-29. This paragraph records that plan's origin; current task progress is in the milestone records and resume point below. M18 remains accepted. These milestones preserve the approved product contract and all existing acceptance limitations, including retired/unaccepted M9 and unverified real-system paths. They do not resume VM work.
|
||||
Status: M19–M20 accepted; M21 in progress; M22–M27 pending. The user approved the proposed direction and requested detailed milestones on 2026-10-29. This paragraph records that plan's origin; current task progress is in the milestone records and resume point below. M18 remains accepted. These milestones preserve the approved product contract and all existing acceptance limitations, including retired/unaccepted M9 and unverified real-system paths. They do not resume VM work.
|
||||
|
||||
### Shared execution contract for M19–M27
|
||||
|
||||
@@ -3957,7 +3957,7 @@ Evidence/handoff: [M20 evidence](docs/evidence/milestone-20.md) records the clea
|
||||
|
||||
### Milestone 21 — Domain ownership of reservations and apply knowledge
|
||||
|
||||
Status: pending. Prerequisite: M20 accepted.
|
||||
Status: accepted (2026-10-29T23:00:09+02:00; independent M21-R1 re-review and integrated Rust gates passed). Prerequisite: M20 accepted (2026-10-29T22:40:28+02:00). The user confirmed this session's coordinator model GPT-6-Sol/medium earlier; dispatches selected GPT-6-Luna/high explicitly. Initial tree clean at `8413b382b178991d2e1e597f1422d147f3454581`; pinned Rust/Cargo 1.97.1, rustfmt 1.9.0 and Clippy 0.1.97 available. M9 is retired/unaccepted by user direction and is not an M21 prerequisite.
|
||||
|
||||
#### Outcome and scope
|
||||
|
||||
@@ -3965,9 +3965,9 @@ Encapsulate address retention and verification transitions without changing pers
|
||||
|
||||
| Task | Owner | State | Bounded deliverable |
|
||||
| --- | --- | --- | --- |
|
||||
| M21.1 | implementer | pending | Encapsulated reservation rules and existing allocator integration |
|
||||
| M21.2 | implementer | pending | Explicit current/historical verification transitions and caller migration |
|
||||
| M21.3 | reviewer; repairer; coordinator | pending | Review invariant matrix, repair and RUST acceptance |
|
||||
| M21.1 | implementer `/root/m21_reservations` | complete | Domain-owned committed/pending reservation sets, exact-host policy and allocator/Commit/discard integration; focused tests passed |
|
||||
| M21.2 | implementer `/root/m21_reservations` | complete | Explicit current/historical verification transitions and caller migration; focused tests passed |
|
||||
| M21.3 | reviewer `/root/m21_reviewer`; repairer `/root/m21_repair`; coordinator | complete | M21-R1 closed on independent re-review; integrated RUST and diff check passed |
|
||||
|
||||
1. Extract `AddressReservations` with private storage and intention-revealing operations to retain removed host addresses, restore conservative persisted reservations and expose read-only iteration/availability. Preserve conflict rejection, draft unsupported-peer reservations, Commit timing, discard behavior, IPv4/IPv6 allocation and broad-route deletion restrictions. Do not enumerate networks or infer free addresses from unavailable runtime data.
|
||||
2. Keep draft-only pending reservations distinct from committed reservations until publication. Follow M19's transition table; preserve reservations from unprojectable exact host routes, and reject unsafe broad-route deletion as before. Move policy, not filesystem/parsing/crypto, into domain.
|
||||
@@ -3977,11 +3977,11 @@ Encapsulate address retention and verification transitions without changing pers
|
||||
|
||||
#### Acceptance and validation
|
||||
|
||||
- [ ] M21-A1: only named domain transitions can release committed reservations; backup/service/read/mismatch/persistence failures cannot release them.
|
||||
- [ ] M21-A2: legacy technical verification without a management snapshot, reopening and current vs historical status retain prior semantics.
|
||||
- [ ] M21-A3: allocator, reservation, persisted round-trip and app failure tests pass; independent invariant review and RUST pass.
|
||||
- [x] M21-A1: only named domain transitions can release committed reservations; backup/service/read/mismatch/persistence failures cannot release them.
|
||||
- [x] M21-A2: legacy technical verification without a management snapshot, reopening and current vs historical status retain prior semantics.
|
||||
- [x] M21-A3: allocator, reservation, persisted round-trip and app failure tests pass; independent invariant review and RUST pass.
|
||||
|
||||
Focused starting commands: `cargo test --locked domain::`, `cargo test --locked persistence::`, `cargo test --locked app::`; reviewer specifically inspects reservation-release callers, not only tests. Evidence: docs/evidence/milestone-21.md. Outcome: not accepted. Handoff: M22 after acceptance.
|
||||
M21.1 and M21.2 focused checks passed. Independent reviewer found M21-R1: `commit_with_adapters` reset current apply status on unchanged Commit, changing prior Verified/Unavailable semantics. Repair removed that call and added three behavioral tests. Independent re-review closed M21-R1 with no remaining scoped finding. Final coordinator commands `cargo fmt --all -- --check`, `cargo clippy --locked --all-targets -- -D warnings`, `cargo test --locked` (399 passed, 3 ignored) and `cargo build --locked --release` all exited 0; `git diff --check` passed. [M21 evidence](docs/evidence/milestone-21.md) records final dirty source and artifact fingerprints, review and validation limits. Outcome: accepted for host/synthetic scope; stop after M21. Next action only on a separate request is M22.1; no fresh Alpine/VM result is claimed.
|
||||
|
||||
### Milestone 22 — Transactional draft editing and client creation vertical slice
|
||||
|
||||
@@ -4159,7 +4159,7 @@ Evidence: docs/evidence/milestone-27.md. Outcome: not accepted. Handoff: stop af
|
||||
|
||||
## Current progress and resume point
|
||||
|
||||
- M20 is accepted (2026-10-29T22:40:28+02:00): renamed apply knowledge, named prepared contexts, independent M20-R1 closure and final RUST gates passed; [M20 evidence](docs/evidence/milestone-20.md) records source/artifact identity and limits. Stop after M20; M21–M27 remain pending. M19 remains accepted; M9 remains retired/unaccepted and its real-system limitations remain unchanged.
|
||||
- M21 is accepted for host/synthetic scope: domain reservation and apply-knowledge ownership, M21-R1 repair, independent re-review and required Rust gates passed. [M21 evidence](docs/evidence/milestone-21.md) records final inputs and limits. M22–M27 remain pending; M9 remains retired/unaccepted and its real-system limitations remain unchanged.
|
||||
|
||||
- M18 was accepted on 2026-10-29: structured, accurate in-app Help, responsive wrapping and bounded scrolling passed independent R1/R2 closure, synthetic/PTY checks and pinned Rust completion gates. [M18 evidence](docs/evidence/milestone-18.md) records final inputs and limits. At that handoff, M19 had not started.
|
||||
|
||||
@@ -4188,7 +4188,7 @@ Evidence: docs/evidence/milestone-27.md. Outcome: not accepted. Handoff: stop af
|
||||
|
||||
- Milestone 8 delivered reviewed opt-in Alpine Testcontainers coverage for real IPv4 WireGuard peers, application lifecycle, saved/runtime separation, restoration, import/reissue, backup failures and the real Rustix reader. Host gates and three fresh real-container runs passed on one stable source fingerprint; M8-A1–A10 accepted. Real IPv6 behavior is unverified by user-authorized scope.
|
||||
- Milestone 9 is retired and unaccepted: the reviewed disposable VM preparation and guarded first start did not establish Debian/systemd acceptance. The exact VM was powered off after the user stopped work. M9.2–M9.3 were not started; M9-A1–A9 are unchecked.
|
||||
- M18/M19 handoffs remain complete. M20 is accepted; the next implementation action, when separately requested, is M21.1. Keep M16 validation limitations separate from TUI evidence. Do not access production, commit, deploy or resume VM work.
|
||||
- M18–M21 handoffs remain complete. Stop after M21; begin M22.1 only on a separate request. Keep M16 validation limitations separate from TUI evidence. Do not access production, commit, deploy or resume VM work.
|
||||
|
||||
## Plan maintenance
|
||||
|
||||
|
||||